Casella-cel Software for the Tuff sampling pumps Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Logiciel Casella-cel Software for the Tuff sampling pumps. Casella CEL Software for the Tuff sampling pumps User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 38
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
TUFF
PERSONAL AIR SAMPLING PUMPS
Go to
Contact Details
OPERATOR’S MANUAL
HB3343-01
PRINTED IN ENGLAND
Vue de la page 0
1 2 3 4 5 6 ... 37 38

Résumé du contenu

Page 1 - OPERATOR’S MANUAL

TUFF™ PERSONAL AIR SAMPLING PUMPS Go to Contact Details OPERATOR’S MANUAL HB3343-01 PRINTED IN ENGLAND

Page 2

G. PROGRAM MODE (PRO ONLY) (Fig. 10) Note: The Advanced Mode must be selected ON to enable this feature. The program is configured on a PC and then

Page 3

I. SET REQUIRED FLOW RATE (Fig. 12) Note: “Set Flow” and “Reset” options are not available in Partial Lock mode. From START, press UP or DOWN arrow t

Page 4

K.USE WITH LOW FLOW ADAPTOR (Fig 14) This enables the instrument to be used with sorbent tubes at flows down to 5 ml/min. 1. Connect the inlet of a p

Page 5

CHAPTER 5 CONFIGURATION This allows basic settings such as display language and measurement units to be changed, gives access to Calibration and Dura

Page 6

Figure 18 Set Temperature E. VOLUME (Fig. 19) TUFF + AND PRO ONLY - Use UP/DOWN keys to select the preferred units to display the sampled volume (i.e.

Page 7

Figure 22 Calibrate Screen I. ADJUSTMENT OF LOW SET POINT (Fig. 23) Use UP/DOWN keys to alter the low set point in l/min. Press ENTER to continue. Th

Page 8

CHAPTER 6 CALIBRATION Perform Single Point Calibration (Set Flow) Figs 27, 28, 29 and 30. This allows the user to set the required flow rate for the

Page 9

A. Clamp B. Sampling Head C. Clamping Studs D. Flowmeter Stand E. (Typical) Digital Calibrator F. Hose (Nominal Diameter 5mm) G. Hose

Page 10 - Casella CEL Limited

CHAPTER 7 RENEWING THE INLET FILTER Note: The filter element should be replaced every 3 months. The pump running time and the operating environment

Page 11

CHAPTER 8 SERVICING Casella CEL’s in house service department offers a comprehensive range of repair and calibration services designed to maintain a f

Page 12

CONTACT DETAILSCASELLA CEL Regent House, Wolseley Road, Kempston, Bedford, MK42 7JY, U.K. Phone: +44 (0) 1234 844 100 Fax: +44 (0) 1234 841 490 E-mail

Page 13

CHAPTER 9 FAULT FINDING The following table outlines some possible fault conditions. SYMPTOM FAULT SUGGESTED REMEDY Failure to switch ON Battery not

Page 14

CHAPTER 10 PUMP MANAGEMENT SOFTWARE NOTICE! CASELLA INSIGHT™ DATA MANAGEMENT SOFTWARE Tuff Pro and Apex Pro personal air sampling pumps can now be p

Page 15

also add an icon to the desktop and a new folder and item to your Programs menu, either of which can be used to start Pump Manager. If installing on W

Page 16

the message line at the bottom left of the display. 2. Click the Pump button and select the Communications/option. A Communication Port dialog is d

Page 17

the Communications Port dialog (Figure 35), normally COM1 or COM2. Figure 35 Add a Pump 3. Select the File menu and see the following options: New

Page 18

Figure 36 Add a (New) Person 4. On the File menu, select New followed by Pump to add a new pump, (or right click on the name of an existing pump) to

Page 19

Figure 37 Typical Pump Manager Screen during Download Sequence If no pump containing data is within range, there will be no response, and the sof

Page 20

Figure 38 Typical Data Download Dialog. When all data has been downloaded, the software clears the data from the pump memory. When any TUFF or Apex

Page 21

Figure 39 Event Properties Screen F INSPECTING DATA, ADDING SUPPLEMENTARY INFORMATION AND PRINTING A REPORT (Fig. 40) Stored data can be inspected,

Page 22

Figure 40 Sample Run Folder The Process Page adds details of the process and substances involved to the sample folder. Process notes Field for adding

Page 23

TABLE OF CONTENTS PLEASE READ CAUTIONS BEFORE ATTEMPTING TO OPERATE THIS INSTRUMENT. SECTION TITLE PAGE 1 Introduction 5 2 Charging the Tuff Unit /

Page 24

8. When all required additional information has been added to the sample folder, highlight the sample folder, then right click. Miscellaneous Page ad

Page 25

information entered via the Sample Properties dialog; The layout of a Pump manager report is shown in Figure 41. Print Preview - Displays a preview of

Page 26

Description - Requires alphanumeric characters to identify the program; Duration - Specifies a run time that can be set in 1 minute steps up to 1 hour

Page 27

Figure 44 Program Properties Dialog H ERROR MESSAGES The following error messages may be displayed by Pump Manager: ERROR: Unable to get status reco

Page 28

CHAPTER 11 TECHNICAL INFORMATION / CERTIFICATION 1 PUMP MODEL SPECIFICATION Flow Range Tuff 3 : 0.5 to 3.5 l/min, Tuff 4 : 0.5 to 4.5 l/min. (all

Page 29

2 PUMP PERFORMANCE Tuff Variants Flow rate (L/min) Back pressure (cm H2O) Current (mA) NiMH 2.7Ah (h) NiMH1.7Ah (h) 1 L/min 2 32 76 48 5 40 61 3

Page 30

Tuff Pump Performance (High Capacity Battery Pack)010203040506070800 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85Back pressure (cm H2O)Run time (

Page 31

3 CE COMPLIANCE TUFF Personal Sampling Pumps are designed to comply with the EMC Directive 89/336/EEC of the European Union. They have been tested ac

Page 32

CHAPTER 12 APPENDIX Back to IndexEND DISCLAIMER Do not attempt to use this equipment until you have read this manual thoroughly,

Page 33

CAUTIONS: The TUFFTM series of air sampling pumps are designed to be robust, however they should not be dropped or subjected to mechanical shock. Do n

Page 34

1. INTRODUCTION The TUFFTM air sampling pump is produced in three models, the TUFF Standard, TUFF Plus and TUFF Pro. This handbook covers the entire r

Page 35

2. CHARGING THE TUFF PUMPS / BATTERIES Battery Part numbers: 197088B (4.8 V, High Capacity Nickel metal- hydride or 197105B 4.8V Standard capacity).

Page 36

Figure 3 Insert Battery in Charger • Insert battery into the charging cradle. • Slow charge (>8-14 hours) starts. Red LED on battery illumin

Page 37

4. OPERATIONA. POWER ON Note: To Set Language go to Configuration Chapter 5. To start the pump, press and release the ON/OFF Key. The Firmware will r

Page 38

E.TIME WEIGHTED AVERAGE (TWA) PRO and PLUS ONLY (Fig. 8) (Only activated when advanced mode is selected-see configuration chapter) This mode allows th

Commentaires sur ces manuels

Pas de commentaire